Which states require a licensed professional to prepare a SWPPP?

Alabama, California, Delaware, Georgia, Kansas, Massachusetts, New Jersey and Rhode Island require a licensed professional for a 1–5 acre site state-wide, and South Carolina requires one above 2 disturbed acres.

Source: SwpppDraft 50-state preparer-requirement table, from a scan of all 50 construction general permitsVerified

What "licensed professional" means varies

The credential named is not the same everywhere. Some permits name a professional engineer; others accept a landscape architect, a land surveyor, a geologist, or a certification such as CPESC or CPSWQ. What they have in common is that every route to the credential starts from an existing licence or from a degree-plus-experience-plus-exam path — none of them is a course you can sit next week.

That is the line this site draws. A credential anyone can obtain by enrolling is a course requirement, and the state is still serviceable. A credential you must already hold is a gate, and we say so and stop.

Two of the nine carry a caveat worth reading

Massachusetts rests on a sentence with a known grammatical ambiguity; read at its strictest it applies state-wide, and we hold to the strict reading rather than serving a state we might be wrong about. Rhode Island's permit expires in September 2026 with a draft already out for comment, so its answer may move.

Questions people ask

Can I use an out-of-state engineer?
The permits that name a licence generally name it as a licence in that state. Read the clause on the state's page — it is quoted there — before you engage anyone.
What do I do if my state is one of the nine?
Contact a professional licensed in that state to prepare and seal the plan. We do not offer that service and we do not refer or take a commission.

The states this question turns on

All 50 states, in one table

Other questions

Check your state and build a draft
The questionnaire and the generator run in your browser. Checkout is not open, so nothing can be charged.

Source: SwpppDraft 50-state preparer-requirement table, from a scan of all 50 construction general permits, read 2026-08-03. County and city rules are not covered.

What we are, and what stays your responsibility

  1. SwpppDraft is a document generation tool. It does not provide engineering services, legal services, or compliance consulting, and no engineer or attorney reviews what it produces.
  2. Everything in the document is built from the site facts you enter. Checking that those facts are right, and that the resulting plan fits your project, is yours to do.
  3. We do not file anything on your behalf, we do not certify or endorse your compliance, and we accept no liability for what happens when you use the document.
  4. State-level requirements carry the date we verified them. County and city rules are not covered — some local jurisdictions require a licensed preparer even where the state does not, and you have to check that yourself.
  5. When the product opens, our total liability will be capped at the amount you paid us. Today that amount is zero, because nothing is for sale.