Why does my state call it something other than a SWPPP?

The document is the same but the name is not: Texas and Ohio call it an SWP3, Kansas an SWP2, Alabama a CBMPP, Rhode Island an SESC plan, Vermont an EPSC plan, South Carolina a C-SWPPP and Pennsylvania splits it into an E&S plan and a PCSM plan.

Source: SwpppDraft 50-state preparer-requirement table, from a scan of all 50 construction general permitsVerified

Why the name matters

Searching for the wrong noun is how people conclude their state has no requirement. The federal permit calls it a stormwater pollution prevention plan; state permits rename it, and a few split it into two documents with different rules for each half.

Pennsylvania is the case worth knowing: its erosion and sediment control plan and its post-construction stormwater management plan are separate, and its licensed-professional requirement attaches to site implementation rather than to writing either one.

One document, one federal contents list

Whatever it is called, the contents list a permit works from is recognisably the federal one (Part 7.2): who the operators are, what the activity is, a site map, the controls, the inspection procedure, the records. The state clause sits on top of that.

Questions people ask

Is an erosion control plan the same as a SWPPP?
Sometimes it is the same document under a different name, and sometimes it is a second, separate plan required by a state erosion-control law on top of the permit. Read your state page and then your permit before assuming one covers the other.
Does the generated document use my state's name for it?
The plan is titled as a SWPPP and carries your state's permit citation inside it. If your permit uses another name, put that name on the cover before you submit it — the file is a .docx precisely so you can.

The states this question turns on

All 50 states, in one table

The documents this affects

Other questions

Check your state and build a draft
The questionnaire and the generator run in your browser. Checkout is not open, so nothing can be charged.

Source: SwpppDraft 50-state preparer-requirement table, from a scan of all 50 construction general permits, read 2026-08-03. County and city rules are not covered.

What we are, and what stays your responsibility

  1. SwpppDraft is a document generation tool. It does not provide engineering services, legal services, or compliance consulting, and no engineer or attorney reviews what it produces.
  2. Everything in the document is built from the site facts you enter. Checking that those facts are right, and that the resulting plan fits your project, is yours to do.
  3. We do not file anything on your behalf, we do not certify or endorse your compliance, and we accept no liability for what happens when you use the document.
  4. State-level requirements carry the date we verified them. County and city rules are not covered — some local jurisdictions require a licensed preparer even where the state does not, and you have to check that yourself.
  5. When the product opens, our total liability will be capped at the amount you paid us. Today that amount is zero, because nothing is for sale.