What does my SWPPP need to say about endangered species?
Part 7.2.9 requires the plan to hold the endangered-species documentation from the Notice of Intent or the Appendix D worksheet, showing which eligibility criterion the site relies on, and any federally listed critical habitat in the action area also has to appear on the site map.
This is where small sites most often stall
The eligibility criterion has to be selected and supported before coverage is valid, and some criteria mean consulting the U.S. Fish and Wildlife Service or the National Marine Fisheries Service. That is a lookup and sometimes a conversation with another agency — it is not something a document generator can complete for you, and SwpppDraft does not pretend otherwise.
Historic properties too
Part 7.2.9 covers more than species: the plan is where the documentation for the other federal requirements is held. Attach the completed paperwork behind that page of the plan rather than filing it separately.
Questions people ask
- Can I skip this if my site is in a city?
- No — the criterion still has to be selected and supported. Urban sites usually land on a straightforward criterion, but "usually" is not a substitute for doing the lookup.
- Does SwpppDraft fill in the worksheet?
- No. It prints the clause, leaves the page for your documentation, and says plainly that this determination is yours.
The states this question turns on
- Texas SWPPP requirements — Texas requires the SWP3 to be developed and implemented by the primary operator; the permit contains no PE, CPESC or licensing language for preparation.
- Arizona SWPPP requirements — Arizona requires a "qualified person", defined to include the operator's own employees as well as outside personnel.
- Ohio SWPPP requirements — Ohio asks for a "professional experienced in the design and implementation" of erosion and sediment controls but names no licence, exam or issuing body, and applies the same clause to 1–5 acre sites. The gate scan's summary table counts Ohio as C; the "experienced professional" wording reads as B2 in its per-state row — self-preparation is allowed either way.
The documents this affects
Other questions
- Who can prepare a SWPPP?
- Which states require a licensed professional to prepare a SWPPP?
- Which states make you take a course before writing a SWPPP?
- Does my site need a licensed professional even though my state allows self-preparation?
- What acreage thresholds change SWPPP requirements?
Check your state and build a draft
The questionnaire and the generator run in your browser. Checkout is not open, so nothing can be charged.
Source: EPA 2022 Construction General Permit (as modified), Part 7.2.9, read 2026-08-04. County and city rules are not covered.
What we are, and what stays your responsibility
- SwpppDraft is a document generation tool. It does not provide engineering services, legal services, or compliance consulting, and no engineer or attorney reviews what it produces.
- Everything in the document is built from the site facts you enter. Checking that those facts are right, and that the resulting plan fits your project, is yours to do.
- We do not file anything on your behalf, we do not certify or endorse your compliance, and we accept no liability for what happens when you use the document.
- State-level requirements carry the date we verified them. County and city rules are not covered — some local jurisdictions require a licensed preparer even where the state does not, and you have to check that yourself.
- When the product opens, our total liability will be capped at the amount you paid us. Today that amount is zero, because nothing is for sale.