What does my SWPPP need to say about endangered species?

Part 7.2.9 requires the plan to hold the endangered-species documentation from the Notice of Intent or the Appendix D worksheet, showing which eligibility criterion the site relies on, and any federally listed critical habitat in the action area also has to appear on the site map.

Source: EPA 2022 Construction General Permit (as modified), Part 7.2.9Verified

This is where small sites most often stall

The eligibility criterion has to be selected and supported before coverage is valid, and some criteria mean consulting the U.S. Fish and Wildlife Service or the National Marine Fisheries Service. That is a lookup and sometimes a conversation with another agency — it is not something a document generator can complete for you, and SwpppDraft does not pretend otherwise.

Historic properties too

Part 7.2.9 covers more than species: the plan is where the documentation for the other federal requirements is held. Attach the completed paperwork behind that page of the plan rather than filing it separately.

Questions people ask

Can I skip this if my site is in a city?
No — the criterion still has to be selected and supported. Urban sites usually land on a straightforward criterion, but "usually" is not a substitute for doing the lookup.
Does SwpppDraft fill in the worksheet?
No. It prints the clause, leaves the page for your documentation, and says plainly that this determination is yours.

The states this question turns on

All 50 states, in one table

The documents this affects

Other questions

Check your state and build a draft
The questionnaire and the generator run in your browser. Checkout is not open, so nothing can be charged.

Source: EPA 2022 Construction General Permit (as modified), Part 7.2.9, read 2026-08-04. County and city rules are not covered.

What we are, and what stays your responsibility

  1. SwpppDraft is a document generation tool. It does not provide engineering services, legal services, or compliance consulting, and no engineer or attorney reviews what it produces.
  2. Everything in the document is built from the site facts you enter. Checking that those facts are right, and that the resulting plan fits your project, is yours to do.
  3. We do not file anything on your behalf, we do not certify or endorse your compliance, and we accept no liability for what happens when you use the document.
  4. State-level requirements carry the date we verified them. County and city rules are not covered — some local jurisdictions require a licensed preparer even where the state does not, and you have to check that yourself.
  5. When the product opens, our total liability will be capped at the amount you paid us. Today that amount is zero, because nothing is for sale.