New Hampshire SWPPP requirements (2026)

Can I write my own SWPPP in New Hampshire?

New Hampshire accepts a SWPPP prepared by the operator — no professional licence is required to write it. Basis: EPA 2022 CGP (no state NPDES authorisation), Appendix A definitions.

Source: EPA 2022 CGP (no state NPDES authorisation), Appendix A definitionsVerified

Who may prepare the plan in New Hampshire

Our reading of EPA 2022 CGP (no state NPDES authorisation), Appendix A definitions:New Hampshire runs on the federal permit, whose "qualified person" definition is a knowledge and skill threshold that in-house staff can meet.

The gate scan classified New Hampshire from EPA 2022 CGP (no state NPDES authorisation), Appendix A definitions, but no single sentence was transcribed for this state — so the paragraph above is our reading, not the permit's words. Read the source and judge it yourself.

How New Hampshire differs from the federal baseline

States with no NPDES authorisation of their own run on the EPA 2022 Construction General Permit, whose "qualified person" definition is a knowledge and skill threshold that the operator's own staff can meet — it names no licence. New Hampshire writes its own version of that same qualified-person threshold into its permit. It is a knowledge threshold, not a credential, so the operator can meet it.

Federal baseline: EPA 2022 CGP (no state NPDES authorisation), Appendix A definitions.

What that means for a 1–5 acre site

Below one disturbed acre, federal construction general permit coverage is usually not required at all unless the site is part of a larger common plan of development. Check whether you need a SWPPP before you pay for one.

Above five disturbed acres you are outside the 1–5 acre range this tool was built for. Several states change their preparer requirements above five acres, so re-read your state permit before relying on a self-prepared plan.

County and city rules are not covered here. This page answers the state-level question only; a local authority can require more, and that is for you to check.

New Hampshire SWPPP questions

Can I write my own SWPPP in New Hampshire?
New Hampshire accepts a SWPPP prepared by the operator — no professional licence is required to write it.
What does New Hampshire mean by a qualified person?
New Hampshire runs on the federal permit, whose "qualified person" definition is a knowledge and skill threshold that in-house staff can meet. The clause is EPA 2022 CGP (no state NPDES authorisation), Appendix A definitions, read on 2026-08-03.
Which acreage counts — the whole site or the disturbed part?
Disturbed area is what these clauses measure, and it is what the questionnaire asks for — a 40-acre parcel with 1.5 disturbed acres is a 1.5-acre project for this purpose. Total site area is asked for separately and does not decide the answer.
Does New Hampshire run its own permit, or the federal one?
On the federal one. New Hampshire is read from the EPA 2022 Construction General Permit rather than from a state-issued construction general permit, and the citation behind every statement on this page is EPA 2022 CGP (no state NPDES authorisation), Appendix A definitions. Anything New Hampshire adds arrives through that permit rather than beside it.
What does a SWPPP cost in New Hampshire?
A consultant-prepared SWPPP for a small site is commonly quoted at around $497 — a market figure inherited from our own competitor review, which we have not re-verified. SwpppDraft intends to charge $99 for the plan and $149 with the forms pack, and is not open for sale yet, so nothing can be bought here today. New Hampshire's permit does not require you to buy anything in order to prepare the plan — what it costs you is the time to answer questions about your own site.
Do county or city rules apply on top of this?
They can, and this page does not cover them. The scan behind it answered the state-level question only, so a county or municipality in New Hampshire may require more — a stamped plan, a local permit, or a different form — even where the state permit does not. Ask the authority that will receive your paperwork before you write the plan, not after.

Build a SWPPP for a site in New Hampshire
The questionnaire and the generator run in your browser and produce a watermarked draft. Checkout is not open, so nothing can be charged.

Source and verification

EPA 2022 CGP (no state NPDES authorisation), Appendix A definitions. Read the source document State-law information on this page was verified on 2026-08-03. County and city rules are not covered. New Hampshire in context:its row in the 50-state table.

What we are, and what stays your responsibility

  1. SwpppDraft is a document generation tool. It does not provide engineering services, legal services, or compliance consulting, and no engineer or attorney reviews what it produces.
  2. Everything in the document is built from the site facts you enter. Checking that those facts are right, and that the resulting plan fits your project, is yours to do.
  3. We do not file anything on your behalf, we do not certify or endorse your compliance, and we accept no liability for what happens when you use the document.
  4. State-level requirements carry the date we verified them. County and city rules are not covered — some local jurisdictions require a licensed preparer even where the state does not, and you have to check that yourself.
  5. When the product opens, our total liability will be capped at the amount you paid us. Today that amount is zero, because nothing is for sale.